TM 55-1520-240-23-3
4-113
INSTALL AND RIG GAS PRODUCER CONTROL LINKAGE
(Continued)
4-113
4.
Make sure No. 1 ENG COND CONT circuit
breaker (8) on No. 1 power distribution panel
(9) is closed.
5.
Make sure CAUTION PNL circuit breaker (10) on
No. 1 power distribution panel (9) is closed.
6.
Set lever (7) to GROUND.
7.
Set lever (7) to FLIGHT.
8.
Set lever (7) to GROUND.
9.
Wait for ENG N1 COND light capsule (11) on
master caution panel (12) to go out.
10.
Open No. 1 ENG COND CONT circuit breaker
(8) on No. 1 power distribution panel (9).
4-401