TM 55-1520-240-23-3
4-13
INSTALL POWERPLANT
(Continued)
4-13
42.
Torque connectors (68) to 65 inch-pounds.
Make sure fire detection sensing
element cannot chafe on powerplant
or cover. Chafing can result in a false
fire indication or an inoperative fire
detection system.
43.
Make sure fire detection sensing element (69)
cannot chafe on powerplant (2) or cover (8).
INSPECT
INSTALL POWERPLANT WITH ENGINE
TRANSMISSION REMOVED
NOTE
Art for steps 44, 46, and 47 is
referenced to install powerplant
with Engine Transmission Installed
section. Referenced art shows engine
transmission installed but will not
affect task performance.
44.
Perform steps 2 and 3. Then go to step 45.
45.
Install sling (6) as follows:
a.
Open access door (7) in engine access cover
(8).
b.
Connect two cables (9) into forward fittings
(10) on powerplant (2).
c.
Connect cable (11) into aft fitting (12) through
cover (8).
d.
Adjust sling (6) until eye (13) is over aft hole
(70) in sling bar (15).
e.
Install pin (16) through bar (15).
46.
Perform step 5 thru 23. Then go to step 47.
47.
Perform steps 28 thru 43. Then go to Follow-On
Maintenance.
4-116