TM 55-1520-240-23-3
4-13
INSTALL POWERPLANT
(Continued)
4-13
NOTE
In order to minimize or alleviate
chafing, the following actions may
be taken with no change of routing
allowed:
a.Installation of spiral wrap.
b. Minor repositioning of existing clamps.
c.Minor reshaping of fire detection sensing
wires.
d. Reclocking of hose connections.
e.Minor reclocking of electrical connectors.
(This should be done only when all
previous methods have been tried.)
30.
Connect hose (43) to port (44). Remove tag.
31.
Connect hose (45) to port (46). Remove tag.
32.
Connect hose (47) to port (48). Remove tag.
33.
Connect hose (49) to port (50). Remove tag.
34.
Connect cable connector (51) to receptacle (52).
Remove tag.
35.
Connect cable connector (53) to receptacle (54).
Remove tag. Lockwire connector. Use lockwire
(E229).
36.
Connect hose (55) to port (56). Remove tag.
37.
Connect hose (57) to port (58). Remove tag.
38.
Connect hose (59) to port (60). Remove tag.
39.
Connect two clamps (61). Install two screws (62)
and nut (63) in bracket (64). Remove tape.
4-114
