TM 55-1520-240-23-10
16-59.8
REMOVE AN/ALE-47 SEQUENCER
16-59.8
INITIAL SETUP
Applicable Configurations:
All
Tools:
Electronic Equipment Tool Kit,
NSN 5180-00-064-5178
Materials:
Paper Tag (E264)
Personnel Required:
Avionics Mechanic
Equipment Condition:
Battery Disconnected (Task 1-39)
Electrical Power Off
Hydraulic Power Off
Cargo Ramp Open and Level (TM 55-1520-240-T)
AN/ALE-47 Safety Switch Pin Installed
(TM 1-1520-240-10)
NOTE
Procedures for removing the LH and
RH sequencers are the same.
1.
Disconnect, tag and cap two electrical
connectors (5 and 7) from J1 and J3 receptacles
on sequencer (6).
CAUTION
Support sequencer while removing
screws. Failure to comply may result
in damage to sequencer or cables.
2.
Remove eight screws (8) and washers (9)
securing sequencer mounting plate (4) to
mounting bracket (1).
3.
Remove four screws (2) and washers (3)
securing sequencer (6) to mounting plate (4).
4.
Remove sequencer (6).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
16-250.18
Change 1