• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLE  PILOTS  COCKPIT CONTROL ASSEMBLY (Continued) ASSEMBLE  PITCH TRANSFER  BELLCRANK
ASSEMBLE  PILOTS  COCKPIT CONTROL ASSEMBLY (Continued) INSTALL  ROLL  AND  THRUST  TRANSFER BELLCRANKS

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  353    354    355    356    357  358  359    360    361    362    363  
TM  55-1520-240-23-9 11-77 ASSEMBLE  PILOT’S  COCKPIT CONTROL ASSEMBLY (Continued) 11-77 ASSEMBLE ROLL TRANSFER  BELLCRANK 17. Press two  bearings (dissimilar metals)  (36  and 37) in  bellcrank (38) until  they  bottom.  Use  arbor press. 18. Install  two  bushings  (dissimilar  metals) (39  and 40) flange  inward,  in  upper lugs of arms (41  and 42). 19. Install  two  bushings  (dissimilar  metals) (43  and 44) in  lower lugs of arms (41  and  42). INSPECT ASSEMBLE THRUST TRANSFER BELLCRANK 20. Press two  bearings (dissimilar metals)  (45  and 46) in  bellcrank (47) until  they  bottom.  Use  arbor press. 21. Install  two  bushings  (dissimilar  metals) (48  and 49) flange  inward,  in  upper lugs of arms (50  and 51). 22. Install  two  bushings  (dissimilar  metals) (52  and 53) in  lower lugs of arms (50  and  51). INSPECT 11-362







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.