• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RIG AFT CABIN AND PYLON LINKAGE (Continued) - TM-55-1520-240-23-9_282
RIG AFT CABIN AND PYLON LINKAGE (Continued) - TM-55-1520-240-23-9_284

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  260    261    262    263    264  265  266    267    268    269    270  
TM  55-1520-240-23-9 11-57 RIG AFT CABIN  AND  PYLON  LINKAGE (Continued) 11-57 52. Working  from  right work platform,  check  bolt (80) of pylon  right upper bellcrank (81).  Measure  and record  distance  between  center of bolt  and  deck (70) of  WL  90.75.  Distance  must  be  7.78 to 8.02 inches.  If  same,  go  to  step  60.  If  not,  perform steps 53  thru  59, then  go  to  step  60. 53. Remove  cotter  pin  (82), nut  (83), two  washers (84  and  85),  and  bolt  (86)  from  bellcrank  (81). Disconnect link (87)  from  bellcrank. 54. Loosen  nut  (88) of link  (87).   Turn  rod  end  (89) clockwise  to  move  arm  (90)  of  bellcrank  (81) down. NOTE One  half  turn  of  rod  end  moves arm about  0.03  inch. 55. Position  link (87) in  bellcrank  (81).   Install  bolt (86),  two  washers  (85  and  84),  and  nut  (83). Tighten  nut. 56. Repeat step  52.   If  distance  is same, go  to  step 57.   If  not,  repeat  steps  52  thru  56. 57. Torque  nut  (88) of link  (87) to  103 inch-pounds. 58. Torque  nut  (83) to  60 to 90 inch-pounds.  Install cotter  pin  (82). 59. Check  bolt (86).  Bolt  shall  not rotate  with  torque less  than  10 inch-pounds.   There  shall  be  no axial  looseness.  If  bolt rotates  or  is  loose,  add washer under nut and  repeat step  58. 11-267







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.