• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RIG AFT CABIN AND PYLON LINKAGE (Continued) - TM-55-1520-240-23-9_283
RIG  AFT  ROTARY  WING BLADES

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  261    262    263    264    265  266  267    268    269    270    271  
TM  55-1520-240-23-9 11-57 RIG AFT CABIN AND PYLON LINKAGE (Continued) 11-57 60. Working  from  forward  left  work  platform,  remove pin  (8)  from  support  (9). FOLLOW-ON  MAINTENANCE: Remove  servocylinder  safety  blocks  (T31)  (Task 11-29). Close  forward  left  workplatform  (Task  2-2). Close  tunnel  access  doors  (Task  2-2). Close  pylon  doors  (Task  2-2). Close  pylon  left  and  right  work  platforms  (Task  2-2). Close  cargo  ramp  (TM  55-1520-240-T). Install  forward  transmission  drip  pan  (Task  2-3). Remove  electrical  power. Remove  hydraulic  power. END  OF  TASK 11-268







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.