• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RIG AFT CABIN AND PYLON LINKAGE (Continued) - TM-55-1520-240-23-9_279
RIG AFT CABIN AND PYLON LINKAGE (Continued) - TM-55-1520-240-23-9_281

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  257    258    259    260    261  262  263    264    265    266    267  
TM  55-1520-240-23-9 11-57 RIG AFT CABIN AND PYLON LINKAGE (Continued) 11-57 28. Check bolt  (49) of pylon  left  lower bellcrank (50). Measure  and  record  distance  between  center of bolt  and  bulkhead  (51) at sta.   534.  Distance must  be  6.69 to 6.93 inches.  If  same,  go  to  step 36.  If  not,  perform  steps  29  thru  35, then  go  to step  36. 29. Remove  cotter  pin  (52),  nut  (53),  two  washers (54  and  55),  and  bolt  (49)  from  bellcrank  (50). Disconnect  link  (36)  from  bellcrank. 30. Working  from  aft  tunnel  section,  loosen  nut (37) of link  (36).  Turn  link clockwise  to  move  bellcrank (50)  forward. NOTE One  half turn  of  link moves  bellcrank about 0.02 inch. 31. Working  in  cabin,  position  link  (36) in  bellcrank (50).  Install  bolt (49),  two  washers  (55  and  54), and  nut  (53).   Tighten  nut. 32. Repeat  step  28.  If  distance  is  same,  go  to  step 33.  If  not,  repeat  steps  28  thru  32. 33. Working  from  aft  tunnel  section, torque  nut (37) of link (36) to  103 inch-pounds. 34. Working  in  cabin,  torque  nut  (53)  to  60 to 90 inch-pounds.  Install  cotter pin  (52). 35. Check  bolt  (49).  Bolt shall  not  rotate  with  torque less  than  10  inch-pounds.   There  shall  be  no axial  looseness.   If  bolt  rotates  or  is loose,  add washer under nut and  repeat  step  34. 11-264







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.