• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RIG AFT CABIN AND PYLON LINKAGE (Continued) - TM-55-1520-240-23-9_280
RIG AFT CABIN AND PYLON LINKAGE (Continued) - TM-55-1520-240-23-9_282

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  258    259    260    261    262  263  264    265    266    267    268  
TM  55-1520-240-23-9 11-57 RIG AFT CABIN  AND  PYLON  LINKAGE (Continued) 11-57 36. Check bolt (56) of pylon right lower bellcrank (57). Measure  and  record  distance  between  center of bolt  and  deck  (58)  at  WL  72.   Distance  must be 3.47 to 3.71  inches.   If  same,  go  to  step  44.   If not, perform  steps 37  thru  43,  then  go  to  step  44. 37. Remove  cotter  pin  (59), nut  (60), two  washers (61  and  62),  and  bolt  (63)  from  bellcrank  (57). Disconnect link (64)  from  bellcrank. 38. Loosen  nut  (65) of link  (64).   Turn  rod  end  (66) clockwise  to  move  arm  (67)  of  bellcrank  (57) down. NOTE One  half  turn  of  rod  end  moves bellcrank about 0.015  inch. 39. Position  link (64) in  bellcrank  (57).   Install  bolt (63),  two  washers  (62  and  61),  and  nut  (60). Tighten  nut. 40. Repeat step  36.   If  distance  is same, go  to  step 41.   If  not,  repeat  steps  36  thru  40. 41. Torque  nut  (65) of link  (64) to  103 inch-pounds. 42. Torque  nut  (60) to  60 to 90 inch-pounds.  Install cotter  pin  (59). 43. Check  bolt (63).  Bolt  shall  not rotate  with  torque less  than  10 inch-pounds.   There  shall  be  no axial  looseness.  If  bolt rotates  or  is  loose,  add washer under nut and  repeat step  42. 11-265







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.