TM 55-1520-240-23-3
4-136
REMOVE POWER TURBINE CONTROL LINKAGE
4-136
INITIAL SETUP
Applicable Configurations:
Without 74
Tools:
Powerplant Repairers Tool Kit, NSN
5180-00-323-4944
Materials:
None
Personnel Required:
Aircraft Powerplant Repairer
Equipment Condition:
Battery Disconnected (Task 1-39)
Electrical Power Off
Engine Work Platform Open (Task 2-2)
Engine Access Cover Open (Task 4-50)
NOTE
Procedure is same to remove power
turbine control linkage from No. 1 or
No. 2 engine. Removal of linkage
from No. 1 engine is shown here.
1.
Remove cotter pin (1), nut (2), and washer (3)
from lever (4).
2.
Remove cotter pin (5), nut (6), and washer (7)
from lever (8).
3.
Remove rod (9).
4-447