TM 55-1520-240-23-3
4-135
INSTALL POWER TURBINE CONTROL LINKAGE ROD
(Continued)
4-135
2.
Position rod (7) on bolt (8). Install washer (9) and
nut (10). Torque nut to 30 to 60 inch-pounds.
Install cotter pin (11).
INSPECT
3.
Position rod (7) on bolt (12). Install washer
(13) and nut (14). Torque nut to 30 to 60
inch-pounds. Install cotter pin (15).
INSPECT
4.
Lockwire nuts (4 and 5). Use lockwire (E229).
INSPECT
FOLLOW-ON MAINTENANCE:
Perform operational check of power turbine system
(TM 55-1520-240-T).
Close engine access cover (Task 4-50).
Close engine work platform (Task 2-2).
END OF TASK
4-446