TM 55-1520-240-23-9
11-191
INSTALL SECOND STAGE MIXING ASSEMBLY
(Continued)
11-191
Bushings must be in bellcranks before
installing bolts; otherwise, damage to
components will result.
NOTE
Impedance bolts are installed in flight
control connections. These bolts are
self-retaining and require a special
nut and torque (Task 1-13).
NOTE
If a crack in the connecting links,
bellcranks, or supports is suspected
during removal, refer to TM
1-1520-253-23.
INSTALL STOP TUBES
1.
Clean seating surfaces (1) of tubes (2 and 3) and
supports (4 and 5). Use cloths (E120).
2.
Apply coat of epoxy primer (E292) on surfaces
(1). Wear gloves (E184.1).
3.
Position tubes (2 and 3) as marked in bores.
Install tubes in supports (4 and 5) while epoxy
primer is wet. Remove tags.
4.
Apply coat of epoxy primer (E292) on four bolts
(6). Wear gloves (E184.1).
5.
Install four washers (7) and bolts (6) in supports
(4 and 5) and tubes (2 and 3) while epoxy primer
is wet.
6.
Install two bolts (8 and 9) heads aft, nuts (10),
four washers (11), and two nuts (12).
7.
Check that distance X between tubes (2 and 3)
and bolt heads (8 and 9) is as recorded on tag.
Remove tags.
11-772
