TM 55-1520-240-23-9
11-182
REMOVE YAW OR THRUST INTERMEDIATE BELLCRANKS
(Continued)
11-182
NOTE
Procedure is same to remove yaw or
thrust intermediate bellcranks. Thrust
bellcrank is shown here.
Attaching bolts, washers, and nuts
will be temporarily installed during
removal of bellcrank (Task 1-13).
NOTE
If a crack in the connecting links,
bellcranks, or supports is suspected
during disassembly, refer to TM
1-1520-253-23.
1.
Remove cotter pin (1), nut (2), two washers (3),
and bolt (4) from thrust intermediate bellcrank
(5). Disconnect link (6) from bellcrank. Tie link
away from bellcrank. Use twine (E433).
2.
Install bolt (4), two washers (3), and nut (2)
loosely in link (6).
3.
Remove cotter pin (7), nut (8), two washers (9),
and bolt (10) from link (11). Disconnect link from
bellcrank (5).
4.
Install bolt (10), two washers (9), and nut (8)
loosely in link (11).
5.
Remove cotter pin (12), nut (13), and washer (14)
from bolt (15) in support (6). Slide bolt inboard
through hole (17) in structure (18) until bellcrank
(5) is released from support. Remove bellcrank.
6.
Slide bolt (15) through two lugs (19) of support
(16). Install washer (14) and nut (13) loosely on
bolt.
FOLLOW-ON MAINTENANCE:
None
END OF TASK
11-721
