TM 55-1520-240-23-7
9-124.1
LIGHT LEAK TEST
(Continued)
9-124.1
DOPPLER SYSTEM LIGHTS
68.
Set doppler system lights to ON (TM
11-1520-240-23). There shall be no white light
leaks, displays only. Lightplate still green.
69.
Set lights to OFF.
COUNTERMEASURE SYSTEM LIGHTS
70.
Set countermeasures system lights to ON (TM
11-1520-240-23).There shall be no white light
leaks, push button on ALQ-156 only. Lightplate
still green.
71.
Set lights to OFF.
FLARE DISPENSER SYSTEM LIGHTS
72.
Set flare dispenser system lights to ON (TM
11-1520-240-23). There shall be no white light
leaks.
73.
Set lights to OFF.
PRESS-TO-TEST LIGHTS
74.
Close the following circuit breakers on the No.
2 PDP (1):
a.
TROOP JUMP IT (79).
b.
RH AUX FWD FUEL PUMP (80).
c.
ENG NO. 2 START AND TEMP (80.1)
(Without 74 ).
d.
CARGO HOOK PWR NORM (81).
75.
Close the following circuit breakers on the No.
1 PDP (23).
a.
LH AUX FWD FUEL PUMP (82).
b.
ENG NO. 1 START AND TEMP (82.1)
(Without 74 ).
9-486