TM 55-1520-240-23-79-124.1LIGHT LEAK TEST(Continued)9-124.1PILOT’S CHRONOMETER LIGHT6.While performing steps 7 through 10, checklighting. There shall be no white light leaks fromNVG blue/green lighting.7.Close PLT CLOCK breaker (18) in No. 2 PDP (1).8.Check pilot’s CHRONOMETER (19). Upperand lower numbers (20) shall be visible andblue/green color lighting shall be on.9.Turn DIM control (21) of chronometer (19).Check chronometer light. Light shall dim over fullrange of control.10.Turn control (21) to brightest light position.11.Open breaker (18) in No. 2 PDP (1). CheckCHRONOMETER (19). Numbers (20) shall notbe visible and light shall be out.9-478
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business