TM 55-1520-240-23-7
9-98.2
INSTALL OVERHEAD PANELS IN PANEL
(Continued)
9-98.2
PLT LTG PANEL
12.
Install PLT LTG panel (107) as follows:
a.
Position panel (107) on panel (2). Tighten
four screws (108).
b.
Remove tape. Connect wire (109) to each of
two receptacles (110). Remove tag.
c.
Remove tape. Connect wire (111) to
receptacle (110) by installing washer (112)
and screw (113). Remove tag.
d.
Remove tape. Connect seven wires (114) to
two transformers (115) by installing washers
(116) and nuts (117). Remove tags.
e.
Connect three wires (117.1) to switch (117.2).
Remove tags.
INSPECT
NOTE
If no other panels are to be replaced,
go to step 15.
9-341