TM 55-1520-240-23-7
9-52.1
REPLACE APU GENERATOR SLAVE RELAY
(Continued)
9-52.1
4.
Position relay (7) on No. 2 PDP (1). Install two
screws (5) and washers (6).
5.
Remove tape from eight wires (4). Position wires
on relay (7). Install eight screws (2) and washers
(3). Remove tags.
INSPECT
6.
Close No. 2 PDP (1).
FOLLOW-ON MAINTENANCE:
Perform operational check of ac power system (TM
55-1520-240-T).
END OF TASK
9-156