TM 55-1520-240-23-7
8-30
INSTALL NO. 1 OR NO. 2 PITOT TUBE
8-30
INITIAL SETUP
Applicable Configurations:
All
Tools:
Electrical Repairers Tool Kit, NSN 5180-00-323-4915
Workstand
Materials:
Sealant (E336)
Personnel Required:
Aircraft Electrician
Inspector
References:
TM 55-1520-240-23P
NOTE
The procedure to install No. 1 or No.
2 pitot tube is the same. Installation
of No. 1 is shown here.
1.
Place pitot tube (1) inside sleeve (2), make sure
fitting (3) protrudes from stepped down end of
sleeve.
8-105