TM 55-1520-240-23-7
8-29
INSTALL NO. 1 OR NO. 2 PITOT TUBE SUPPORT
8-29
INITIAL SETUP
Applicable Configurations:
All
Tools:
Electrical Repairers Tool Kit, NSN 5180-00-323-4915
Workstand
Materials:
Dry Cleaning Solvent (E162)
Cloths (E120)
Gloves (E186)
Twine (E433)
Sealant (E336)
Parts:
Seal Washers
Personnel Required:
Aircraft Electrician
Inspector
References:
TM 55-1520-240-23P
Dry cleaning solvent (E162) is
combustible and toxic. It can irritate
skin and cause burns. Use only with
adequate ventilation, away from open
flame. In case of contact, immediately
flush skin or eyes with water for
at least 15 minutes. Get medical
attention for eyes.
NOTE
The procedure to install No. 1 or
No. 2 pitot tube support is the same.
Installation of No. 1 pitot tube support
is shown here.
1.
Clean pitot tube mount area (1). Use dry cleaning
solvent (E162), cloth (E120), and gloves (E186).
2.
Pull wire harness connector (2) through access
hole (3).
3.
Install pitot line (4) to fitting (3).
4.
Install grommet (6).
8-103
