TM 55-1520-240-23-6
7-329
FLUSH UTILITY PUMP AND APU RETURN TUBING
(Continued)
7-329
29.
Remove plug (6) from tee (5).
30.
Position accumulator mount (3) on tees (4 and
5). PRESS port (4) down.
31.
Install four bolts (1) and washers (2) in mount (3).
INSPECT
FOLLOW-ON MAINTENANCE:
Install APU start accumulator (Task 7-149).
Perform operational check of utility hydraulic system
(TM 55-1520-240-T).
Close ramp (TM 55-1520-240-T).
Close pylon right access panel (Task 2-2).
END OF TASK
7-1213