TM 55-1520-240-23-6
7-279
ASSEMBLE CARGO DOOR SEQUENCE VALVE (AVIM)
(Continued)
7-279
12.
Install cartridge (19) in body (3).
13.
Install retainer (20) and four screws (21).
14.
Lockwire screws (21). Use lockwire (E231).
15.
Remove body (3) from vise (4).
INSPECT
FOLLOW-ON MAINTENANCE:
Test cargo door sequence valve (Task 7-280).
END OF TASK
7-1038