TM 55-1520-240-23-4
5-135
INSTALL PITCH LINK BOOT
(Continued)
5-135
9.
If using twine (E433) (24) tie pitch link boot (3)
as follows:
a.
Cut two 24 inch lengths of twine (E433) (24).
b.
Tie one 1 inch loop (25) 6 inches from one
end of length of twine (E433) (24).
c.
Pass long end of twine (E433) (24) around
boot (3) at bottom of zipper (10), and through
loop (25).
d.
Pull twine (E433) (24) tight and wrap around
boot (3) four to five times.
e.
Tie ends of twine (E433) (24) together with
double square knot (26).
f.
Cut off ends of twine (E433) (24) 1/4 inch
from knot (26).
g.
Pass end of another length of twine (E433)
(24) around cone (17) through loops (19)
three times.
h.
Tie ends of twine (E433) (24) together with
square knot (27).
i.
Pass long end of twine (E433) (24) through
tab (16) of zipper (10), then through loops
(19) around cone (17).
j.
Pass twine (E433) (24) down through zipper
slider (21) and back through loops (19)
around cone (17).
k.
Tie ends of twine (E433) (24) together with
double square knot (28).
l.
Cut off twine (E433) (24) 1/4 inch from knot
(28).
INSPECT
FOLLOW-ON MAINTENANCE:
None
END OF TASK
5-739