TM 55-1520-240-23-45-97.1INSPECT PITCH LINK WITH TEFLON BEARINGS ON HELICOPTER(Continued)5-97.19.If dial indicator average in step 8 is more than0.010 inch, remove pitch link (13) (Task 5-97)and check bearing clearance (Task 5-98).10.Pull zipper (11) up. Install tie (9) on pitch linkboot (10).FOLLOW-ON MAINTENANCE:Close forward or aft work platform (Task 2-2).END OF TASK5-589
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business