TM 55-1520-240-23-4
5-95
PREPARE PITCH LINK FOR STORAGE OR SHIPMENT
(Continued)
5-95
NOTE
Procedure is same to prepare any
pitch link for storage or shipment.
1.
Clean pitch link (1). Use cloth (E120) damp with
solvent (E162). Wear gloves (E186).
2.
Wrap pitch link (1) tightly in barrier material (E80)
(2). Seal with waterproof tape (E395) (3).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
5-574