TM 55-1520-240-23-4
5-96
PREPARE PITCH LINK FOR SERVICE
(Continued)
5-96
In order to keep from shearing pin
in center of pitch link hold rod end
closest to the nut and loosen.
5.
Hold rod end (3) closest to the nut and turn upper
checknut (7) to tighten. Torque checknut to 1050
to 1300 inch-pounds.
5.1.
Hold rod end (4) closest to the nut and turn lower
checknut (8) to tighten. Torque checknut to 1050
to 1300 inch-pounds.
6.
Install cotter pins (6). Keep split ends within
outside of indicator sleeves (18) to avoid boot
damage.
7.
Lockwire turnbuckle (9) to hole in pin (19). Use
lockwire (E231).
8.
Remove pitch link (5) from assembly fixture (T78)
(11) as follows:
a.
Remove pins (16 and 17).
b.
Loosen hand knob (13). Move sliding angle
(14) clear.
c.
Remove pitch link (5).
INSPECT
FOLLOW-ON MAINTENANCE:
None
END OF TASK
5-578