TM 55-1520-240-23-4
5-94
ADJUST PITCH LINK
(Continued)
5-94
5.
Lower thrust control (4).
FOLLOW-ON MAINTENANCE:
Install pitch link boot (Task 5-135).
Close work platforms (Task 2-2).
Electrical power off.
Hydraulic power off.
Perform tracking and balancing per TM
1-6625-724-13&P.
Check autorotation % RPM (Task 5-139).
END OF TASK
5-569