• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL  AFT  FUSELAGE  BELLCRANK  (FORWARD  SIDE  STATION  482 BULKHEAD) (Continued) - TM-55-1520-240-23-9_984
REMOVE  AFT  BELLCRANK  STA 482 (Continued)

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  951    952    953    954    955  956  957    958    959    960    961  
TM  55-1520-240-23-9 11-250 REMOVE  AFT BELLCRANK  STA  482 11-250 INITIAL  SETUP Applicable Configurations: All Tools: Aircraft  Mechanic’s Tool  Kit, NSN 5180-00-323-4692 Workstand Materials: Twine  (E433) Personnel  Required: Medium  Helicopter Repairer (2) References: TM  1-1520-253-23 Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power Off Hydraulic  Power Off Safety  Blocks  (T31)  Installed  (Task  11-28) Pylon  Work  Platforms  Open  (Task 2-2) Aft  Servocylinder Connecting  Links  Disconnected (Task  11-192) Cargo  Ramp  Open  And  Level  (Task 2-2) NOTE If  a  crack  in  the  connecting  link, bellcrank,  or support  is suspected during  removal,  refer  to  TM 1-1520-253-23. 1. Tag  bellcrank  (1).  Remove  cotter pin  (2), nut (3), two  washers (4),  and  bolt (5),  from  bellcrank and connecting  link  (6). 2. Remove  cotter  pin  (7), nut  (8), two  washers (9), and  bolt (10) from  bellcrank (1)  and  right side connecting  link  (11). 3. Disconnect  connecting  links  (6  and  11)  from bellcrank (1).  Tie  connecting  link  (11) out of way. Use  twine  (E433). 11-969







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.