• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL TUNNEL CONTROLS  IDLER (Continued) - TM-55-1520-240-23-9_962
REMOVE  AFT FUSELAGE  CONNECTING LINKS

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  931    932    933    934    935  936  937    938    939    940    941  
TM  55-1520-240-23-9 11-243 INSTALL TUNNEL CONTROLS  IDLER (Continued) 11-243 10. From  outside  lift  control  arm  (11).   Swing  idler (1)  under  control  arm. 11. Install  bolt  (12), two  washers  (13  and  14),  and nut  (15).  Torque  nut to  85 to 125 inch-pounds. Install  cotter  pin  (16). 12. Check  bolt (12).  Bolt  shall  not rotate  with  torque less  than  10 inch-pounds.   Bolt  shall  have  no axial  looseness.  If  bolt rotates  or  is  loose,  add washer under nut and  repeat step  11. NOTE If  connecting  links  are  changed  in length,  perform neutral  rig  check Task 11-33). INSPECT FOLLOW-ON MAINTENANCE: Connect  servocylinder  connecting  links  (Task 11-193). Remove  safety  blocks (Task  11-29). Perform  functional  test of tunnel controls  (Tasks 11-5 and  11-6). Close  tunnel  access door  No.  3  (Task 2-2). END  OF  TASK 11-947/(11-948  blank)







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.