• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL TUNNEL CONTROLS  IDLER (Continued) - TM-55-1520-240-23-9_963
REMOVE  AFT FUSELAGE  CONNECTING LINKS (Continued)

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  932    933    934    935    936  937  938    939    940    941    942  
TM  55-1520-240-23-9 11-244 REMOVE  AFT FUSELAGE  CONNECTING LINKS 11-244 INITIAL  SETUP Applicable  Configurations: All Tools: Aircraft Mechanic’s  Tool  Kit,  NSN  5180-00-323-4692 Materials: Paper  Tags  (E264) Personnel  Required: Medium  Helicopter Repairer (2) References: TM  1-1520-253-23 Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power  Off Hydraulic  Power Off Safety  Blocks  (T31)  Installed  (Task  11-28) Servocylinder Connecting  Links  Disconnected  (Task 11-192) Tunnel  Access  Covers Opened  (Task 2-2) Pylon  Doors  Opened  (Task  2-2) Cargo  Ramp  Opened  (TM  55-1520-240-T) 11-950







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.