• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL TUNNEL CONTROL ARMS     (Continued) - TM-55-1520-240-23-9_954
INSTALL TUNNEL CONTROL ARMS     (Continued) - TM-55-1520-240-23-9_956

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  923    924    925    926    927  928  929    930    931    932    933  
TM  55-1520-240-23-9 11-241 INSTALL TUNNEL CONTROL ARMS (Continued) 11-241 15. Position  four connecting  links  (23)  on  control arm  (15). 16. Install  two  bushing  (29),  two  bolts  (24),  two washers  (25),  two  washers  (26),  and  two  nuts (27).  Torque  two  nuts  to  60  to 90  inch-pounds. Install  cotter  pin  (28). 17. Check  bolts  (24).   Bolts  shall  not  rotate  with torque  less  than  10 inch-pounds.   Bolts  shall have  no  axial  looseness.   If  bolt  rotates  or  is loose, add  washer under nut  and  repeat step  16. 18. Check  clearance  between  bolt  (24) and  idler (16).   Clearance  shall  be  0.060 inch  minimum. If  clearance  is  more  than  0.060 inch,  go  to  step 22.   If clearance  is  less  than  0.060 inch,  go  to step  19. Epoxy  primer  (E292.1)  is flammable and  toxic.   It  can  irritate  skin  and cause  burns.  Use  only with  adequate ventilation,  away  from  heat  and open  flame.  Avoid  contact  with  skin, eyes,  or clothing.  In  case  of contact, immediately flush  skin  or eyes  with water  for  at  least 15 minutes.   Get medical  attention  for eyes. 19. Remove  cotter  pin  (28), nut  (27), two  washers (26  and  25),  and  bolt  (24).   Burnish  idler  (16) under bolt  hole.   Use  abrasive  paper (E11).  Do not  burnish  more  than  0.040  inch  deep  and 1  inch  in  diameter.   There  shall  be  no  sharp indentations or  gouges in  burnished  area.  Touch up  burnished  area  with  two  coats  of epoxy primer (E292.1).  Wear gloves (E184.1). 20. Install  bolt (24), two  washers  (25  and  26) and  nut (27).  Torque  nut  to  60 to 90 inch-pounds. 21. Install  cotter  pin  (28).   Turn  ends  of  cotter  pin into  nut  castellations  to  maintain  0.060 inch clearance. 22. Check  bolt (24).  Bolt  shall  not rotate  with  torque less  than  10 inch-pounds.   Bolt  shall  have  no axial  looseness.  If  bolt rotates  or  is  loose,  add washer under nut  and  repeat steps 20  and  21. 11-939







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.