• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVE  DAMAGED RIG  PIN  FROM  FIRST STAGE  CONTROLS (Continued)
REMOVE  DAMAGED RIG PIN FROM  SECOND  STAGE  CONTROLS

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  71    72    73    74    75  76  77    78    79    80    81  
TM  55-1520-240-23-9 11-19 REMOVE DAMAGED RIG PIN  FROM  FIRST STAGE  CONTROLS (Continued) 11-19 7. Remove  section  of  pin  (1)  from  fittings (6  and  7). 8. Inspect  first  stage  controls  for  damage  (Task 11-18). 9. Install  bellcranks (2,  3,  4, and  5)  (Task 11-189). 10. Rig  first  stage  controls  (Task 11-51). FOLLOW-ON  MAINTENANCE: Connect  forward  and  aft  servocylinder  connecting links (Task  11-193). Remove  servocylinder  safety  blocks  (Task 11-29). Perform  neutral  rig  check (Task  11-33). Perform  operational  check  of  flight  controls  (TM 55-1520-240-T). Close  forward  left  work  platform  (Task  2-2). Install  forward  transmission  drip  pan  (Task 2-3). END  OF  TASK 11-78







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.