• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL AFT LCT YOKE (Continued) - TM-55-1520-240-23-9_926
REMOVE  TUNNEL FORWARD  CONNECTING LINKS (Continued)

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  896    897    898    899    900  901  902    903    904    905    906  
TM  55-1520-240-23-9 11-234 REMOVE  TUNNEL FORWARD  CONNECTING  LINKS 11-234 INITIAL  SETUP Applicable  Configurations: All Tools: Aircraft Mechanic’s  Tool  Kit,  NSN  5180-00-323-4692 Materials: Paper  Tags  (E264) Personnel  Required: Medium  Helicopter Repairer References: TM  1-1520-253-23 Equipment  Condition: Battery Disconnected  (Task  1-39) Electrical  Power  Off Hydraulic  Power Off Forward  Transmission  Fairing  Left  Work  Platform Opened  (Task  2-2) Tunnel  Access  Doors  Open  (Task 2-2) Safety  Blocks  (T31) Installed  (Task  11-28) Servocylinder Connecting  Links  Disconnected  (Task 11-192) NOTE Procedure  is  same  to  remove  left or right  forward  connecting  links.  Right forward  end  at  sta.  129.5  and  aft end at  sta.  163  are  shown  here. NOTE If  a  crack  in  the  connecting  link or  second  stage  bellcrank  is suspected  during  removal, refer to  TM 1-1520-253-23. 1. Tag  connecting  link (1). 2. Remove  cotter pin  (2),  nut (3), two  washers (4), and  bolt  (5)  from  connecting  link (1) and  second stage  bellcrank (6). 3. Remove  connecting  link (1) from  bellcrank (6). 11-912







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.