• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RIG PITCH CONTROL POSITION  INDICATOR
RIG COCKPIT TRANSFER BELLCRANKS (Continued) INSTALL TRANSFER  BELLCRANK  RIG PIN

TM-55-1520-240-23-9 CH-47D Heilcopter Manual
Page Navigation
  186    187    188    189    190  191  192    193    194    195    196  
TM  55-1520-240-23-9 11-46 RIG  COCKPIT  TRANSFER BELLCRANKS 11-46 INITIAL  SETUP Applicable Configurations: All Tools: Aircraft  Mechanic’s Tool  Kit, NSN 5180-00-323-4692 Torque  Wrench,  30  to  150  Inch-Pounds Transfer Bellcrank  Rig  Pin  (T128) Materials: None Parts: Cotter Pins Personnel  Required: Medium  Helicopter Repairer Inspector Equipment  Condition: Disconnect  Battery (Task 1-39) DASH Actuator Set to  36  Inches  (Task  11-165) or Dummy Link  Installed  (Task 11-26) Electrical  Power Off Servocylinder  Safety Blocks  (T31)  Installed  (Task 11-28) Hydraulic  Power Off Copilot’s  Rigging  Fixture  (T39)  Installed  (Task 11-22) Copilot’s  Thrust  Control  Rig  Pin  (T122) Installed (Task  11-22) Copilot’s  Yaw  Pedal  Rig  Pin  (T127) Installed  (Task 11-22) Copilot’s  Control  Stick  Yoke  (T125)  Installed  (Task 11-22) Closet Acoustic  Blanket  Removed  (Task 2-107) Closet Backup  Panel  Removed  (Task  2-2) General Safety Instructions: Make  sure  bushings  are  in  bellcranks before  installing  bolts;  otherwise, damage  to  bellcranks  will  result. 11-193







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.