• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSPECT PITCH  LINK  WITH  TEFLON  BEARINGS  ON  HELICOPTER (Continued) - TM-55-1520-240-23-4_606
INSPECT PITCH  LINK  WITH  TEFLON  BEARINGS  ON  HELICOPTER (Continued) - TM-55-1520-240-23-4_608

TM-55-1520-240-23-4 CH-47D Heilcopter Manual
Page Navigation
  577    578    579    580    581  582  583    584    585    586    587  
TM  55-1520-240-23-4 5-97.1 INSPECT PITCH LINK WITH  TEFLON BEARINGS  ON  HELICOPTER (Continued) 5-97.1 3. Cut  tie  (9)  on  pitch  link  boot  (10).   Pull  zipper (11) down. 5-587







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.