• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSPECT PITCH LINK WITH TEFLON  BEARINGS  ON  HELICOPTER
INSPECT PITCH LINK WITH  TEFLON BEARINGS  ON  HELICOPTER (Continued) - TM-55-1520-240-23-4_607

TM-55-1520-240-23-4 CH-47D Heilcopter Manual
Page Navigation
  576    577    578    579    580  581  582    583    584    585    586  
TM  55-1520-240-23-4 5-97.1 INSPECT PITCH  LINK  WITH  TEFLON  BEARINGS  ON  HELICOPTER (Continued) 5-97.1 2. Check  for  bond  looseness  in  upper bearing  (4) and  lower  bearing  (5)  as  follows: a. Check  that  Teflon  liner (7)  has  not  been squeezed  out  around  bearing  ball  (6).   If some  cloth  threads  show, this is  not always a  sign  of  bond  failure.   If  strings  of  fabric are  coming  out  from  around  bearings  (4 and  5), or if  liner shows  1/32  inch  or  more, replace  bearing  (4  or 5) (Task  5-98) and  go to  Follow-On  Maintenance.  If less  than  1/32 inch of  liner shows,  go  to  step  b. b. Have  helpers support blade  (1).  Check pitch link  rod  end  (8).  If  rod  end  is not  centered on  bearing  ball  (6),  replace  bearing  (4  or  5) (Task 5-98).  Shake rod  end  from side-to-side. Movement shows  that  the  Teflon  liner (7) is worn  or missing.  Have  helpers lower blade (1).  Replace  bearing  (4  or 5)  (Task 5-98).  If rod  end  is  centered  and  will  not  shake  from side-to-side,  go  to  Follow-On  Maintenance. 5-586







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.