• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSPECT PITCH LINK WITH  TEFLON BEARINGS  ON  HELICOPTER (Continued) - TM-55-1520-240-23-4_607
INSPECT PITCH LINK WITH  TEFLON BEARINGS  ON  HELICOPTER (Continued) - TM-55-1520-240-23-4_609

TM-55-1520-240-23-4 CH-47D Heilcopter Manual
Page Navigation
  578    579    580    581    582  583  584    585    586    587    588  
TM  55-1520-240-23-4 5-97.1 INSPECT PITCH  LINK  WITH  TEFLON  BEARINGS  ON  HELICOPTER (Continued) 5-97.1 4. To check upper bearing wear, clamp dial indicator (12)  at  upper end  of pitch  link (13)  as shown. 5. Have  helpers  support and  twist rotary-wing  blade (1) to  raise  pitch  arm  (14).   Note  dial indication. Have  helpers twist  blade  to  lower pitch  arm.  Note dial  indication.  Difference  is  total looseness. 6. Repeat  step  5  two  more  times.  Add  total of three indications.   Divide  by  3. 7. Repeat  steps  4, 5,  and  6  for lower  bearing  (5). Remove  dial  indicator  (12). 8. If  dial  indicator average  in  step  6  or  7  is more than  0.010  inch,  go  to  step  9.   If  dial  indicator (12)  shows 0.010  inch  or  less,  go  to  Follow-On Maintenance. 5-588







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.