TM 55-1520-240-23-9
11-105
REMOVE YAW THRUST OR ROLL CONNECTING LINKS OR PITCH, YAW, THRUST OR
ROLL INPUT LINKS BETWEEN STA 95 AND STA 120
(Continued)
11-105
Rotary-wing heads must not be
turned; otherwise, damage to
components will result.
Do not move cockpit thrust control;
otherwise, damage to components
will result.
NOTE
If a crack in the connecting links is
suspected during removal, refer to TM
1-1520-253-23.
NOTE
Procedure is same to remove yaw,
thrust, or roll connecting links, or
pitch, yaw, thrust or roll input links.
Thrust connecting link is shown here.
1.
Tag thrust connecting link (1). Remove cotter
pin (2), nut (3), two washers (4), and bolt (5).
Disconnect link from bellcrank (6).
2.
Install bolt (5), two washers (4), and nut (3)
loosely in bellcrank (6).
3.
Remove cotter pin (7), nut (8), two washers (9),
and bolt (10) from bellcrank (11). Remove link
(1).
4.
Install bolt (10), two washers (9), and nut (8)
loosely in bellcrank (11).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
11-529
