TM 55-1520-240-23-9
11-44
RIG PITCH OVERTRAVEL STOP
(Continued)
11-44
18.
Position housing (15) over access (17). Install 32
washers (14) and screws (13).
INSPECT
FOLLOW-ON MAINTENANCE:
Remove DASH actuator dummy link (Task 11-27).
Install DASH actuator (Task 11-164).
Perform operational check of landing light (TM
55-1520-240-T).
Remove hydraulic power.
Remove electrical power.
Install closet acoustic blanket (Task 2-108).
Install closet backup panel (Task 2-210).
Install passageway overhead acoustic blanket (Task
2-2).
END OF TASK
11-191