TM 55-1520-240-23-7
8-12
INSTALL NO. 1 GAS PRODUCER TACHOMETER GENERATOR
(Continued)
8-12
3.
Position tachometer generator (4) on mount pad
studs (2) with receptacle positioned at 2 oclock.
4.
Install two washers (5) and nuts (6) on two
inboard studs. Do not tighten nuts at this time.
5.
Position bracket (7) over two outboard studs (2).
6.
Install two washers (5) and nuts (6) on two
outboard studs. Tighten four nuts.
7.
Connect connector (8). Lockwire connector with
lockwire (E231).
8.
Connect drain hose (10).
9.
Connect drain hose (11).
10.
Connect drain hose (12).
11.
Connect drain hose (13).
12.
Remove cap from fuel control fitting (15) and
connect fuel hose (14) to fitting.
13.
Remove caps and connect oil scavenge hose
(16) to dual chip detector housing fitting (17).
INSPECT
FOLLOW-ON MAINTENANCE:
Check engine oil level (Task 1-52).
Operation check of gas producer tachometer
generator (TM 55-1520-240-T).
Close engine access cover (Task 4-50).
Close engine work platform (Task 2-2).
END OF TASK
8-38