TM 55-1520-240-23-7
9-162.2
INSTALL FUZZ BURNOFF POWER MODULE
9-162.2
INITIAL SETUP
Applicable Configurations:
With 37
Tools:
Electrical Repairers Tool Kit, NSN 5180-00-323-4915
Materials:
None
Personnel Required:
Aircraft Electrician
Inspector
References:
TM 55-1520-240-23P
1.
Position module (1) against angle assemblies
(2). Install four screws (3) and washers (4).
2.
Connect electrical connector (5) to receptacle (6).
INSPECT
FOLLOW-ON MAINTENANCE:
Perform operational check of chip burnoff system (TM
55-1520-240-T).
END OF TASK
9-648