TM 55-1520-240-23-6
7-259
INSTALL HOIST PRESSURE REDUCING VALVE
(Continued)
7-259
4.
Position valve (3) on structure (13). Install two
bolts (14) and washers (15).
5.
Connect two tubes (16 and 17) to tee (1). Tighten
nut (4). Remove tag from tubes.
6.
Connect two tubes (18 and 19) to tee (5). Tighten
nut (9). Remove tag from tubes.
7.
Connect tube (20) to nipple (10). Remove tag
from tube.
INSPECT
FOLLOW-ON MAINTENANCE:
Service utility hydraulic system (Task 1-59 or 1-62).
Perform operational check of hoist (TM
55-1520-240-T).
Install heat compartment acoustic blanket (Task
2-210).
END OF TASK
7-951