TM 55-1520-240-23-6
7-11
PREPARE FLIGHT CONTROL HYDRAULIC SYSTEM AFTER FLUSHING (PRESSURE
LINES)
(Continued)
7-11
NO. 2 POWER CONTROL MODULE
17.
Remove test hose (36) and fittings (37) from
pump pressure line (38) and from system
pressure line (39).
INSPECT
AFT SERVO CYLINDERS
NOTE
Pivoting servocylinders is reached
from left work platform. Swiveling
servocylinder is reached from right
work platform. Pivoting servocylinder
only shown here.
18.
Remove four caps from elbows (40 and 41) on
both pivoting and swiveling servocylinders (42).
19.
Remove plugs from pressure hoses (43 and 44)
at both servocylinders (42).
20.
Connect pressure hoses (43) to elbows (40) and
pressure hoses (44) to elbows (41).
INSPECT
7-73