PREPARE FLIGHT CONTROL HYDRAULIC SYSTEM AFTER FLUSHING (PRESSURE
LINES)
(Continued)
7-11
NO. 2 LOWER CONTROLS MODULES
10.
Remove test hose (23) from tee fitting (24) and
from AFCS pressure line (25).
11.
Remove test hose (26) and tee fitting (24) from
pressure out line (27). Plug open lines.
INSPECT
NO. 1 LOWER CONTROLS MODULE
12.
Remove test hose (28) from tee fitting (29).
13.
Remove test hose (28) and fitting (30) from
AFCS pressure line (31).
14.
Remove test hose (32) and fitting (33) from
pressure in line (34).
15.
Remove test hose (32) from tee fitting (29).
16.
Remove tee fitting (29) from pressure out line
(35). Plug all lines.