TM 55-1520-240-23-6
7-203
INSTALL RAMP TRANSFER CYLINDER CHECK VALVE
(Continued)
7-203
1.
Install four retainers (1) and two packings (2) on
valve (3).
2.
Install valve (3) in XFR CYL CV port (4) of
module (5).
3.
Lockwire valve (3) to module (5). Use lockwire
(E231).
INSPECT
FOLLOW-ON MAINTENANCE:
Perform operational check (TM 55-1520-240-T).
Service utility hydraulic reservoir (Task 1-59 or 1-62).
Close cargo ramp (TM 55-1520-240-10).
END OF TASK
7-790