TM 55-1520-240-23-6
7-59
INSTALL NO. 1 OR NO. 2 POWER TRANSFER UNIT MODULE
(Continued)
7-59
NOTE
Procedure is same to install No. 1 or
No. 2 power transfer module. No. 1
module is shown here.
1.
Position module (1) on structure (2). Install four
bolts (3) and washers (4). Do not tighten bolts at
this time.
2.
Connect tube (5) to SEAL DRAIN port (6).
Remove tag.
3.
Connect tube (7) to DRAIN port (8). Remove tag.
4.
Connect tee (9) to flow limiter (10).
5.
Connect tee (11) to RETURN port (12).
6.
Connect tube (13) to INLET port (14). Remove
tag.
7.
Connect tube (15) to PRESS port (16). Remove
tag.
8.
Connect connector (17) to SOL PLT VALVE (18).
9.
Torque bolts (3) to 60 inch-pounds.
7-279