TM 55-1520-240-23-6
7-16
FILLING AND BLEEDING FLIGHT CONTROL HYDRAULIC SYSTEMS
(Continued)
7-16
37.
Disconnect test stand pressure line (26) from
PRESSURE connection (23) and test stand
return line (27) from SUCTION connection (25).
38.
Replace dust cover (22) on PRESSURE
connection (23) and dust cover (24) on RETURN
connection (25).
INSPECT
FOLLOW-ON MAINTENANCE:
Perform operational check of flight control hydraulic
systems (TM 55-1520-240-T).
Electrical power off.
Close right forward work platform (Task 2-2).
Close left pylon access door (Task 2-2).
Install forward transmission drip pan (Task 2-3).
Close left transmission baffle (Task 2-2).
Install controls closet acoustic blanket (Task 2-108).
Install controls closet panel (Task 2-2).
Close hydraulic connection access panel (Task 2-2).
END OF TASK
7-105