TM 55-1520-240-23-6
7-268
ASSEMBLE 114H5111 RAMP CONTROL VALVE (AVIM)
(Continued)
7-268
3.
Press poppet (3) Into pressure port (5). Use
dowel (6).
4.
Install one retainer (7) and one packing (8) on
each of three poppets (9).
5.
Slide first poppet (9) into bore of body (4) and
position in port (10).
6.
Press poppet (9) into port (10). Use dowel (6).
7.
Slide second pooppet (9) into bore of body (4)
and position in port (11).
8.
Press poppet (9) into port (11). Use dowel (6).
9.
Slide third poppet (9) into bore of body (4) and
position in port (12).
10.
Press poppet (9) into port (12). Use dowel (6).
11.
Install one retainer (13) and one packing (14) on
each of four valve caps (15).
12.
Install one spring (16) and one valve cap (16) in
each of four ports (5, 10, 11, and 12).
7-982