TM 55-1520-240-23-5
6-48
PREPARE FORWARD TRANSMISSION FOR SHIPMENT OR STORAGE
(Continued)
6-48
9.
Install transmission (2) in shipping container
(T74) (10) as follows:
a.
Inspect and prepare container (10) (TB
55-8100-200-25).
b.
Install hoisting eye (T32) (11) in top of shaft
(12). Connect work hoist hook (13) to eye
marked AFT SHAFT.
c.
With aid of helper, place transmission (2)
in container (174) (10). Align it with four
mounting brackets (14).
d.
Remove hoisting eye (11) from transmission
(2).
e.
Secure transmission (2) to container
mounting brackets (14) with four bolts
(15) and nuts (16). Torque nuts to 55
foot-pounds.
f.
Prepare required maintenance forms and
records (DA PAM 738-751 and TB 750-126).
g.
Put eight 16-unit bags of desiccant (E160)
into container (10).
INSPECT
h.
Install cover (17) on container (10). install
bolts (18), washers (19), split washers (20),
and nuts (21) at 24 places.
i.
Tighten nuts (21) at 3, 6, 9, and 12 oclock.
Tighten nuts at 2, 4, 8, and 10 oclock.
Tighten remaining nuts.
6-176
