TM 55-1520-240-23-4
5-61.1
REPLACE INBOARD DAMPNER UPPER LUG BUSHING
(Continued)
5-61.1
9.
Using bolt/bushing (6), (with the pawl in a
closed position) install the bushing (5) on the
bolt/bushing (6).
10.
Reclean outer surface of bushing (5) using a
clean cloth (E120) wet with acetone (E20).
NOTE
Air dry primer/activator for 5 minutes
prior to application of locking
compound.
11.
Coat the outer surface of bushing (5) with
Locquic Primer T (E295.1), and allow to air dry.
NOTE
Air dry primer/activator for 5 minutes
prior to application of locking
compound.
12.
Coat the upper lug bore (4) with primer/activator,
Locquic Primer T (E295.1) and allow to air dry.
NOTE
The upper lug must beat room
temperature when Loc-Tite No. 635
is applied.
13.
Coat the upper lug bore (4) with Loc-Tite No. 635
(E345.2) retaining compound.
NOTE
If bushing does not seat with hand
force, lightly tap the head of the bolt
with a plastic mallet until bushing
is seated. Ensure bushing is not
protruding beyond the upper or lower
surface of the pitch housing lug.
14.
Install bushing bolt (6) into upper lug (2). When
installing the bolt/bushing into lug use caution to
ensure that the bushing (5) does not separate
from bolt/bushing (6).
5-267
