TM 55-1520-240-23-3
4-14.1
REMOVE POWER TURBINE INLET TEMPERATURE (PTIT) WIRE HARNESS
4-14.1
INITIAL SETUP
Applicable Configurations:
All
Tools:
Powerplant Mechanics Tool Kit, NSN
5180-00-323-4944
Materials:
None
Personnel Required:
Aircraft Powerplant Repairer
Equipment Condition:
Battery Disconnect (Task 1-39)
Electrical Power Off
Engine Access Cover Open (Task 4-49)
NOTE
Procedure is same to remove PTIT
wire harness from No. 1 or No. 2
engine. No. 2 engine is shown here.
1.
Disconnect connectors (1 and 2).
2.
Remove screw (3), nut (4), and clamps (5).
3.
Remove screw (6), nut (7), and clamps (8).
3.1.
Remove screw (8.1), nut (8.2), and clamps (8.3).
4.
Remove PTIT wire harness (9).
FOLLOW-ON MAINTENANCE:
None
END OF TASK
4-125